Since Roman times, several crossings named London Bridge have spanned the River Thames between the City of London and Southwark in central London. The current crossing, which opened to traffic in 1973, is a box girder bridge built from concrete and steel. It replaced a 19th-century stone-arched bridge, which in turn superseded a 600-year-old stone-built medieval structure. In addition to the roadway, for much of its history, the broad medieval bridge supported an extensive built up area of homes and businesses, part of the City's Bridge ward, and its southern end in Southwark was guarded by a large stone City gateway. The medieval bridge was preceded by a succession of timber bridges, the first of which was built by the Roman founders of London (Londinium) around AD 50.

The current bridge stands at the western end of the Pool of London and is positioned upstream from the medieval alignment. The approaches to the medieval bridge were marked by the church of St Magnus-the-Martyr on the northern bank and by Southwark Cathedral on the southern shore. Until Putney Bridge opened in 1729, London Bridge was the only road crossing of the Thames downstream of Kingston upon Thames. London Bridge has been depicted in its several forms, in art, literature, and songs, including the nursery rhyme "London Bridge Is Falling Down", and the epic poem The Waste Land by T. S. Eliot.

The modern bridge is owned and maintained by Bridge House Estates, an independent charity of medieval origin overseen by the City of London Corporation. It carries the A3 road, which is maintained by the Greater London Authority. The crossing also delineates an area along the southern bank of the River Thames, between London Bridge and Tower Bridge, that has been designated as a business improvement district.

History Location The abutments of modern London Bridge rest several metres above natural embankments of gravel, sand and clay. From the late Neolithic era the southern embankment formed a natural causeway above the surrounding swamp and marsh of the river's estuary; the northern ascended to higher ground at the present site of Cornhill. Between the embankments, the River Thames could have been crossed by ford when the tide was low, or ferry when it was high. Both embankments, particularly the northern, would have offered stable beachheads for boat traffic up and downstream – the Thames and its estuary were a major inland and Continental trade route from at least the 9th century BC.Merrifield, Ralph, London, City of the Romans, University of California Press, 1983, pp. 1–4. The terraces were formed by glacial sediment towards the end of the last Ice Age.

There is archaeological evidence for scattered Neolithic, Bronze Age and Iron Age settlement nearby, but until a bridge was built there, London did not exist.D. Riley, in Burland, J.B., Standing, J.R., Jardine, F.M., Building Response to Tunnelling: Case Studies from Construction of the Jubilee line Extension, London, Volume 1, Thomas Telford, 2001, pp. 103 – 104. A few miles upstream, beyond the river's upper tidal reach, two ancient fords were in use. These were apparently aligned with the course of Watling Street, which led into the heartlands of the Catuvellauni, Britain's most powerful tribe at the time of Caesar's invasion of 54 BC. Some time before Claudius's conquest of AD 43, power shifted to the Trinovantes, who held the region northeast of the Thames Estuary from a capital at Camulodunum, nowadays Colchester in Essex. Claudius imposed a major colonia at Camulodunum, and made it the capital city of the new Roman province of Britannia. The first London Bridge was built by the Romans as part of their road-building programme, to help consolidate their conquest.The site of the new bridge determined the location of London itself. The alignment of Watling Street with the ford at Westminster (crossed via Thorney Island) is the basis for a mooted earlier Roman "London", sited in the vicinity of Park Lane. See Margary, Ivan D., Roman Roads in Britain, Vol. 1, South of the Foss Way – Bristol Channel, Phoenix House Lts, London, 1955, pp. 46 – 47.

Roman bridges It is possible that Roman military engineers built a pontoon type bridge at the site during the conquest period (AD43). A bridge of any kind would have given a rapid overland shortcut to Camulodunum from the southern and Kentish ports, along the Roman roads of Stane Street (now the A3, A24, A29 and A285) and Watling Street (now the A5 to the north of the river and A2 south east through Kent). The Roman roads leading to and from London were probably built around AD50, and the river-crossing was possibly served by a permanent timber bridge. On the relatively high, dry ground at the northern end of the bridge, a small, opportunistic trading and shipping settlement took root and grew into the town of Londinium.Margary, Ivan D., Roman Roads in Britain, Vol. 1, South of the Foss Way – Bristol Channel, Phoenix House Lts, London, 1955, pp. 46–48.

A smaller settlement developed at the southern end of the bridge, in the area now known as Southwark. The bridge may have been destroyed along with the town in the Boudican revolt (AD 60), but Londinium was rebuilt and eventually became the administrative and mercantile capital of Roman Britain. The bridge offered uninterrupted, mass movement of foot, horse, and wheeled traffic across the Thames, linking four major arterial road systems north of the Thames with four to the south. Just downstream of the bridge were substantial quays and depots, convenient to seagoing trade between Britain and the rest of the Roman Empire.Jones, B., and Mattingly, D., An Atlas of Roman Britain, Blackwell, 1990, pp. 168–172.Merrifield, Ralph, London, City of the Romans, University of California Press, 1983, p. 31.

Early medieval bridges With the end of Roman rule in Britain in the early 5th century, Londinium was gradually abandoned and the bridge fell into disrepair. In the Anglo-Saxon period, the river became a boundary between the emergent, mutually hostile kingdoms of Mercia and Wessex. By the late 9th century, Danish invasions prompted at least a partial reoccupation of the site by the Saxons. The bridge may have been rebuilt by Alfred the Great soon after the Battle of Edington as part of Alfred's redevelopment of the area in his system of burhs,Jeremy Haslam, 'The Development of London by King Alfred: A Reassessment'; Transactions of the London and Middlesex Archaeological Society, 61 (2010), 109–44. Retrieved 2 August 2014 or it may have been rebuilt around 990 under the Saxon king Æthelred the Unready to hasten his troop movements against Sweyn Forkbeard, father of Cnut the Great. A skaldic tradition describes the bridge's destruction in 1014 by Æthelred's ally Olaf,. There is no reference to this event in the Anglo-Saxon Chronicle. See: to divide the Danish forces who held both the walled City of London and Southwark. The earliest contemporary written reference to a Saxon bridge is , when chroniclers mention how Cnut's ships bypassed the crossing during his war to regain the throne from Edmund Ironside.See Battle of Brentford (1016)

Following the Norman Conquest in 1066, King William I rebuilt the bridge. It was repaired or replaced by King William II, destroyed by fire in 1136, and rebuilt in the reign of Stephen. Henry II created a monastic guild, the "Brethren of the Bridge", to oversee all work on London Bridge. In 1163, Peter of Colechurch, chaplain and warden of the bridge and its brethren, supervised the bridge's last rebuilding in timber.Thornbury, Walter, Old and New London, 1872, vol.2, p.10

Old London Bridge (1209–1831)

After the murder of his former friend and later opponent Thomas Becket, Archbishop of Canterbury, the penitent Henry II commissioned a new stone bridge in place of the old, with a chapel at its centre dedicated to Becket as martyr. The archbishop had been a native Londoner, born at Cheapside, and a popular figure. The Chapel of St Thomas on the Bridge became the official start of pilgrimage to his Canterbury shrine; it was grander than some town parish churches, and had an additional river-level entrance for fishermen and ferrymen. Building work began in 1176, supervised by Peter of Colechurch. The costs would have been enormous; Henry's attempt to meet them with taxes on wool and sheepskins probably gave rise to a later legend that London Bridge was built on wool packs.

In 1202, before Colechurch's death, Isembert, a French monk who was renowned as a bridge builder, was appointed by King John to complete the project. Construction was not finished until 1209. There were houses on the bridge from the start; this was a normal way of paying for the maintenance of a bridge, though in this case it had to be supplemented by other rents and by tolls. From 1282 two Bridge wardens headed an organisation known as Bridge House, appointed to maintain the bridge fabric. Neglect of this duty was blamed for two known collapses of the bridge, one in 1281 (involving five arches) and one in 1437 (involving two arches). In 1212, perhaps the greatest of the early fires of London broke out, spreading as far as the chapel and trapping many people.

The bridge was about long, and had nineteen piers, supported by timber piles. The piers were linked above by nineteen arches and a wooden drawbridge. Above and below the water-level, the piers were enclosed and protected by 'starlings', supported by deeper piles than the piers themselves. The bridge, including the part occupied by houses, was from wide. The roadway was mostly around wide, varying from about 14 feet to 16 feet, except that it was narrower at defensive features (the stone gate, the drawbridge and the drawbridge tower) and wider south of the stone gate. The houses occupied only a few feet on each side of the bridge. They received their main support either from the piers, which extended well beyond the bridge itself from west to east, or from 'hammer beams' laid from pier to pier parallel to the bridge. It was the length of the piers which made it possible to build quite large houses, up to deep.

The numerous starlings restricted the river's tidal ebb and flow. The difference in water levels on the two sides of the bridge could be as much as , producing ferocious rapids between the piers resembling a weir.Pierce, p.45 and Jackson, p.77 Only the brave or foolhardy attempted to "shoot the bridge" – steer a boat between the starlings when in flood – and some were drowned in the attempt. The bridge was "for wise men to pass over, and for fools to pass under."Rev. John Ray, "Book of Proverbs", 1670, cited in Jackson, p.77 The restricted flow also meant that in hard winters the river upstream was more susceptible to freezing.

The number of houses on the bridge reached its maximum in the late fourteenth century, when there were 140. Subsequently, many of the houses, originally only 10 to 11 feet wide, were merged, so that by 1605 there were 91. Originally they are likely to have had only two storeys, but they were gradually enlarged. In the seventeenth century, when there are detailed descriptions of them, almost all had four or five storeys (counting the garrets as a storey); three houses had six storeys. Two-thirds of the houses were rebuilt from 1477 to 1548. In the seventeenth century, the usual plan was a shop on the ground floor, a hall and often a chamber on the first floor, a kitchen and usually a chamber and a waterhouse (for hauling up water in buckets) on the second floor, and chambers and garrets above. Approximately every other house shared in a 'cross building' above the roadway, linking the houses either side and extending from the first floor upwards.