Bilimora high-speed railway station is an under construction high-speed railway station on the Mumbai–Ahmedabad high-speed rail corridor. It is located at Kesali village near Bilimora, Gujarat, India. It is the sixth station of the Mumbai-Ahmedabad high-speed rail corridor, after Vapi station and before Surat station. It was initially scheduled to be completed by December 2024, and is slated to become operational by August 2027 along with the opening of the Surat-Vapi section of the high-speed rail corridor.
Construction The National High-Speed Rail Corporation Limited (NHSRCL) had invited tenders for Package "C4" of the Mumbai-Ahmedabad high-speed rail corridor (MAHSR) in September 2020, with a deadline of around 4 years. In October 2020, Larsen and Toubro won the tender. The NSHRCL signed an agreement with Larsen and Toubro for the design and construction of Vapi station and its depot, Bilimora station, Surat and its depot, Bharuch and Vadodara stations in November 2020. In July 2021, Larsen and Toubro began construction on the station after acquiring 11.4 hectares of land near Kesali. The station is slated to be completed by August 2026, the time also slated for opening of the Gujarat section of the high-speed rail corridor.
Lines The station will be served by the Mumbai–Ahmedabad high-speed rail corridor, and will be the sixth station of the Mumbai–Ahmedabad high-speed rail corridor in Bilimora.
Structure The station will have two platforms and two tracks for regular services. It will have three levels–the platform, concourse and service floor as the entrance level. The design of the station building will be inspired by the mango plantations because of its surrounding location covered by plantations. The station area will have 2 platforms of 425 m (1,394 ft) length for 16-coach E5 Series Shinkansen trains.
Station Layout (TBC)
GStreet LevelExit/EntranceL1MezzanineFare control, station agent, Automatic vending machines, crossoverPFOB, Side platform | P1 Doors will open on the leftPlatform 1Towards → SabarmatiNext Station: SuratExpress LinesTowards → SabarmatiExpress LinesTowards ← Mumbai BKCPlatform 2Towards ← Mumbai BKCNext Station: VapiFOB, Side platform | P2 Doors will open on the leftL2
Features Its design has been made to accommodate sufficient space for passenger movement and amenities at the concourse and platform areas. There will be ticketing and waiting areas, a business-class lounge, a nursery, restrooms, smoking rooms, information booths, retail centres and a public information and announcement system. Moreover, skylight provisions will be present on the roof and exterior sides for natural lighting and reduced energy usage. The station will be developed as a transport hub through integration with autos, buses and taxis. Such features will be available in all 12 stations of the Mumbai-Ahmedabad high-speed rail corridor.
Connectivity Road The existing road linking Gandevi with the Bilimora-Chikhli Road or Gujarat SH-15 will be upgraded to link the station with the Golden Quadrilateral and the under-construction Delhi–Mumbai Expressway. Most of the stations being built in the Gujarat section of the Mumbai-Ahmedabad high-speed rail corridor are located near or next to state or national highways, in order to provide better and direct connectivity to the stations.
Rail The nearest railway station after the station's completion will be Bilimora railway station, located south-west from the station.
See also High-speed rail in India Mumbai-Ahmedabad high-speed rail corridor National High Speed Rail Corporation Limited